Research Projects

Research ME

Research Project Grants Received in ME

Funding Agency : DST SRG

S.No Name of the Principal Investigator Department Sanctioned Letter Number with date Project Title Duration of the Project Total Sanctioned Amount Status of the Projects
1 Dr.S.Baskaran ME File No. 8-118/FDC/RPS (policy-1)/2019-20Date-2020-08-14 Investigation and identification of machinability challenges of Hadfield steel through novel sustainable machining approach 3 Years Rs. 18,93,922 Ongoing
Total Amount Rs. 18,93,922.00/-

Funding Agency : DST CRG

S.No Name of the Principal Investigator Department Sanctioned Letter Number with date Project Title Duration of the Project Total Sanctioned Amount Status of the Projects
1 P.I Dr.Srijan Sengupta ME File Number: CRG/2019/001440Date-2019-12-14 Novel in-situ volume contractible metal halide negative electrodes for high performance lithium-ion batteries 3 years Rs.32,00,000/- Approved
2 Co PI Dr.PBN Prasad ME File Number: CRG/2019/001440Date-2019-12-14 Novel in-situ volume contractible metal halide negative electrodes for high performance lithium-ion batteries 3 years Rs.32,00,000/- Approved
Total Amount Rs. 64,00,000.00/-

Funding Agency : Institute Funded

S.No Name of the Principal Investigator Department Sanctioned Letter Number with date Project Title Duration of the Project Total Sanctioned Amount Status of the Projects
1 Dr John Baruch ME TEQIP-II/Seed Grant/MITS/Date-2016-12-01 Studies on Wear Behavior of H20 Steel parts produced by Additive Manufacturing 6 Month Rs.60,000/- Completed
2 Dr. C. Yuvaraj ME TEQIP-II/Seed Grant/MITS/Date-2016-12-01 Design and Development of mixing equipment for producing SS 3161 – CNT composites by Metal injection molding process 6 Month Rs.50,000/- Completed
3 Dr. K. V. P. Chakradhar ME TEQIP-II/Seed Grant/MITS/Date-2016-12-01 Development of Aluminium-Diamond composite for Heat Sink 6 Month Rs.50,000/- Completed
4 Dr. A. Bala Raju ME TEQIP-II/Seed Grant/MITS/Date-2016-12-01 Stores for smart cities(ATR) 6 Month Rs.50,000/- Completed
5 Dr.T.Vishnu Vardhan ME TEQIP-II/Seed Grant/MITS/Date-2016-12-01 Experimental investigations & Optimization of process parameters on various drilling techniques to reduce the delamination of GFRP composites 6 Month Rs.55,000/- Completed
6 Mr. M. Vamsi Krishna ME TEQIP-II/Seed Grant/MITS/Date-2016-11-01 Enhancement of Tar Cracking Efficiency using Nano Catalyst for Biomass Gasification 6 Month Rs.50,000/- Completed
7 Dr. S. Bhaskaran ME EQIP-II/Seed Grant/MITS/Date-2016-12-15 Investigation on Wear resistance of high strength aluminum alloy under crygenic treatment 6 Month Rs.50,000/- Completed
8 Dr. G. Sayiram ME Dr. G. SayiramDate-2016-12-15 Development of Laser Peening of Gas Tungsten Arc Welding for Incoloy 800H and Stainless steel AISI 321 Dissimilar Metals 6 Month Rs.50,000/- Completed
Total Amount Rs. 4,15,000.00/-

Funding Agency : Institute of Engineers, Kolkatta

S.No Name of the Principal Investigator Department Sanctioned Letter Number with date Project Title Duration of the Project Total Sanctioned Amount Status of the Projects
1 Dr. C. Yuvaraj & Mr. Bathina Sreenivasulu ME File No. R.4/2/UG/16-17/UG2017049, dated:12.04.2017Date- Development of High Strength Material for Micro Air Vehicle Structures 1 year Rs.25,000 Completed
Total Amount Rs. 25,000.00/-

Funding Agency : UGC-SERO MINOR PROJECT

S.No Name of the Principal Investigator Department Sanctioned Letter Number with date Project Title Duration of the Project Total Sanctioned Amount Status of the Projects
1 Dr. Mohd Mujahed Ali ME File No. MRP-6707/16(SERO-UGC),Date-2017-06-30 Skill Development for Enhancing Employability for Unemployed Youth of Andhra Pradesh Region 2 years Rs.2,35,000/- Completed
2 Mr Gunasekhar Reddy M ME File No. MRP-6098/15(SERO/UGC),Date-2015-01-01 Design and Development of Hybrid Vehicle for Physically Challenged Persons 2 years Rs.3,30,000/- Completed
Total Amount Rs. 5,65,000.00/-

Funding Agency : DST-SERB

S.No Name of the Principal Investigator Department Sanctioned Letter Number with date Project Title Duration of the Project Total Sanctioned Amount Status of the Projects
1 Dr.I.Arun & Dr.C.Yuvaraj ME File No.ECR/2016/000470,Date-2016-09-08 Investigation and Characterization of Electrical Discharge Coated (EDC) Alloys for Mitigation of Biological Fouling on Maritime Structures. 3 years Rs.38,37,690/- Ongoing
2 Dr.P.Suryanarayana raju ME File No. YSS/2014/000894,Date-2015-09-08 Simulation and Analysis of Fire Accidents in Passenger Train Cars 3 years Rs.25,79,600/- Ongoing
3 Dr. G. Harinath gowd ME File No. SB/FTP/ETA-0178/2014,Date-2015-07-15 Experimental Investigations and Hybrid Approach for Modelling and Multi Objective Optimization of Pulsed Laser Milling of Micro-Channels 3 years Rs.34,39,000/- Completed
Total Amount Rs. 98,56,290.00/-

Funding Agency : Institute of Engineers,Kolkatta

S.No Name of the Principal Investigator Department Sanctioned Letter Number with date Project Title Duration of the Project Total Sanctioned Amount Status of the Projects
1 Dr.C.Yuvaraj & Mr.Bathina Sreenivasulu ME File No. R.4/2/UG/13-14(IE),Date-2013-10-23 Design and Fabrication of Multi-Crop Smashing Combination Thresher 1 year Rs.50,000/- Completed
Total Amount Rs. 50,000.00/-